Facilities

TROPIC Power has infrastructure and operational facilities in Singapore and KL Malaysia featuring world-class, state-of-the-art machinery logistic and warehousing systems, providing customers the best available service and support.

  • Singapore & Malaysia (KL)
  • Fully equipped with various sizes of overhead cranes
  • Supported with our world-class logistics and warehousing systems
  • Model testing facilities with control room to enable testing of up to 4 generator sets. Equipped with load bank capacity of 4 mega-watts.
  • Certified testing equipment and instruments

New Assembly Facilities @ Iskandar Plant

We continue to stay ahead of the curve, investing in upgrades and expansion – including brand new assembly facilits in the Iskandar Development Region in Johor, Malaysia – in anticipation of future needs and demands.

  • Land Area – Approximate 87,120 sq ft
  • Build Up Area – Approximate 55,365 sq ft
  • Fully equipped with various sizes of overhead cranes
  • Humidity Controlled Painting Facility
  • World-class logistics and warehousing systems
  • State-of-the-art testing facilities with high-tech controller room. Testing Capacity of 4 x 3,500kVA
  • Located at District of Kulaijaya
  • 30km from the Second Link, Singapore
  • 10km from Senai Airport
  • 35km from the Port of Tanjung Pelepas (PTP)
  • Surrounded with Malls, Housing, Resort Hotel, Golf Course and Kulai Hospital